S No. SUB-HEAD AMOUNT (NRs) REMARKS - Dhm.gov.np
S No. SUB-HEAD AMOUNT (NRs) REMARKS all complete as per drawings and specification .(Note:measurement shall be done for vertical projected cut area) Pre-construction anti-termite treatment & creating a continuous chemical barrier under and all ... Retrieve Here
Damp Proofing - Wikipedia
Damp proofing is defined by the American Society for Testing and Materials (ASTM) as a material that resists the passage of water with no hydro-static pressure and waterproof as a treatment that resists the passage of water under pressure. Cavity wall construction, ... Read Article
Duplex Individual House At Surapet - YouTube
Specification Description STRUCTURE R.C.C Column Foundation with 9''brick wall all round and 4'-6"tk wall as partitions, internally and Externally. LOFT & CU ... View Video
STANDARD SPECIFICATIONS FOR BUILDING WORKS
Standard specification for page 1 of 38 building works standard specifications for building works . anti termite treatment:- scope pre-construction chemical treatment: ... Access Doc
Thirumulaivoyil General Specification
GENERAL SPECIFICATION Pre-construction anti termite soil treatment. SUPER STRUCTURE R.C.C framed structure with 9" brick Walls for the exterior, 4.5" brick walls for the interior with cement plastering. FLOORING Vitrified tile 24" x 24" flooring for the hall, bedrooms, ... Get Document
Termite Pest Control 9811191551 - YouTube
Termite Control This is silent enemy enters building/structures from below the ground level. Perforating the foundation, Pre-Construction Anti - termite treatment:-Chemical emulsion apply at follwing stages:- ... View Video
Volume 2 Of TENDER DOCUMENTS
6 Anti-termite Treatment 24 7 Damp Proof Course 29 In case there is no I.S.I. specification for the particular work, such work shall be carried out in accordance (Part II - Pre-constructional chemical treatment). 3. Mortar : ... Read Content
CPWD SPECIFICATIONS
Introduced as anti-termite chemical. Further, constructional measures have been provided instead of pre-construction anti-termite treatment. 8.3 Mortars: Specifications of lime mortar which is not in use now a days have been deleted. ... Access Content
Specification To Be Followed For The Proposed Construction Of ...
Specification to be followed for the Proposed Construction of Integrated Hostel Building and Transit Quarters Complex, G+5 Pre-construction anti-termite treatment is to be conducted at different stages ... Return Doc
(PREVIEW) - Standards (BIS
Code of Practice for Anti-Termite Measures in Buildings PART 3 TREATMENT FOR EXISTING BUILDINGS (ThirdRevision) 1 SCOPE This standard (Part 3) covers measures for the 16131 Specification for imidacloprid (under print) suspension concentrate (SC) ... Read More
GENERAL SPECIFICATION (As per structural engineering design) Pre-construction anti termite soil treatment. walls for the interior with cement plastering SUPER STRUCTURE R.C.C framed structure with 9" brick Walls for the exterior, 4.5" brick ... Fetch Document
(PREVIEW) HANDBOOK ON BUILDING CONSTRUCTION PRACTICES ...
HANDBOOK ON BUILDING CONSTRUCTION PRACTICES (Excluding Electrical Work) INTRODUCTION The National planning of work, collection of materials, earthwork and related termite treatment, foundations, superstructure of masonry; wood Code of practice for anti-termite measures in ... Access Content
Will not accept the termiticide. • Use anti-back flow equipment on all DuPont™ ALTRISET™ termiticide is intended for use as a remedial and/or preventive termite control product in both pre- and post-construction tion and for pre-construction treatment. The ALTRISET™ termiticide ... Fetch Content
Protecting Buildings From Subterranean Termites
For traditional Australian construction, ie: using timber floors off the ground, associated with the specification and use of timber and timber Protecting Buildings from Subterranean Termites NAFI Timber Manual Datafile P5 ... Fetch Document
SPECIFICATIONS: ANTI-TERMITE TREATMENT TO FOUNDATIONS AND ...
Given in the succeeding sub paragraphs is the specification for Anti-Termite Treatment of 1981 for pre-construction treatment using chemical CHLOROPYRIOPHOS EC20. structures completely termite proof and the minimum life of such termite proofing treatment shall be ten ... Fetch This Document
TECHNICAL COMMITTEE: Building Construction Practices ...
TECHNICAL COMMITTEE: Building Construction Practices Sectional Committee, CED 13 ADDRESSED TO: Part 2 Pre-Constructional Chemical Treatment Chlorpyrifos and Lindane recommending its use as anti-termite treatment. vii) Measures for human protection has been widened. ... Return Document
THE ORISSA STATE CO- 23(5$7,9(0,/.352'8&(56¶)('(5$7,21/7' D-2 ...
Subterranean pest infestation as per ISO Certified specification or an approved equivalent specialized agency. DOCUMENTS TO BE ENCLOSED ALONG WITH THE TECHNICAL BID: carrying out pre-construction Anti-termite treatment with chlorpyriphos /lindane E.C 20% with 1% concentration at the ... View Full Source
TERMITE TREATMENT SPECIFICATIONS
Specifically designed for use in termite control work and shall have the properties of both killing and of may be anticipated specifically for slab-on-ground type construction provided the same as applied strictly Termite Treatment Specifications 3 of 3 ... View This Document
PESTCONTROL Pest Control Services - Specs
PRE-BID CONFERENCE Complete scope of service will be explained at the mandatory job walk to be held on ____day, _____, This specification is part of a comprehensive structural Integrated Pest Management (IPM) Program for properties owned, ... View Document
No comments:
Post a Comment